Convenient to public transportation
Redeveloped existing buildings and site
Created courtyards and other seating areas for public use
Planted scores of new trees and landscaped thousands of square feet that were previously non-pervious
Installed new reflective white TPO roof system
Installed dual flush water closets used in tenant spaces
Installed motion and photo cell sensors for control of common area lighting
Installed fluorescent lighting fixtures in common area and tenant spaces
Recycled 140,730 lbs of scrap metal
Recycled wood materials from demolished building on site for new common area picnic tables
Recycled cardboard packaging, bottles and cans
Reused window units from demolished building on site
Installed floor leveler that contains recycled materials and is low VOC
Installed locally-milled soapstone and slate
Installed renewable cork flooring systems in common area and in tenant spaces
Installed operable windows, skylights and ceiling fans in tenant spaces
Implemented the use of low VOC-emitting paints
Introduced daylight with installation of new storefronts, skylights, sun tubes and interior courtyards into existing buildings
Installed interior glass to enhance and expand naturally lighted areas
Removed hazardous electrical transformers on site